I realized that it looks like not much go done between cabinet installation and countertops arrival. Lots of lights and outlets were installed.
Take note of the undercabinet lights and know that the ceiling lights are on a dimmer to add to any mood. Crown molding and footboards were also added to the cabinets.
Thursday, February 17, 2011
February 14, 2011
Happy Valentine's Day!!
The countertops arrive. What a great Valentine's Day present. All was going so well. The seam was matched and is invisible. Then the undercabinet sinks were go to in. Small prep sink looks great. They were about to adhere the large sink when he noticed that it was cracked and chipped. UGH!!! Quick call to Kathy, the designer who ordered the sink. She found one online and had it shipped ASAP. The countertop dudes would be back on Thursday. Crisis averted. This hiccup delayed the backsplash etc.
I think they look great.
The countertops arrive. What a great Valentine's Day present. All was going so well. The seam was matched and is invisible. Then the undercabinet sinks were go to in. Small prep sink looks great. They were about to adhere the large sink when he noticed that it was cracked and chipped. UGH!!! Quick call to Kathy, the designer who ordered the sink. She found one online and had it shipped ASAP. The countertop dudes would be back on Thursday. Crisis averted. This hiccup delayed the backsplash etc.
I think they look great.
Monday, February 7, 2011
February 3, 2011
The cabinets arrived just after the snow storm. Chris helped pull the big truck up the driveway. They finally made it. The unloading started. Kathy was here and helped tell which piece was which and where it should go. The laundry, dinning and kitchen were full of cabinets. Now it was time for the guys to play cabinet Tetris. I'm not sure how they did it but the cabinets seemed to go in very quickly.
Friday, February 4th the countertops were measured and will be here in 10 days.
Now for the photos.
Friday, February 4th the countertops were measured and will be here in 10 days.
Now for the photos.
Tuesday, February 1, 2011
February 1, 2011
I have the best crew doing this kitchen remodel. They showed up today to work even though they arrived by 9 am at the start of the 2011 Blizzard. It has continued to snow and blow all day. We have about 12 inches by the time they left at 3:30. But more progress and different smells in the house today. Fresh paint. I hope you like the color. I think once the cabinets are in the paint will be less "sunshine".
This is Chris painting the ceiling and walls.
Note the floors. They will be beautiful.
The wall area not painted will be where cabinets are planned.
This is Chris painting the ceiling and walls.
Note the floors. They will be beautiful.
The wall area not painted will be where cabinets are planned.
January 31, 2011
This is Sean putting in the kitchen oak floor. He installed the other wood floors in the rest of the house. He will be back on Wednesday to finish the installation and then return later in the renov to finish the floor. I love progress
Friday, January 28, 2011
January 28, 2011
An absolutely beautiful day. Snow melting and 55 degrees outside. Perfect day to finish the siding on the outside and the drywall inside. Next week will be wood floors.
January 25-27, 2011
Finally some progress to photograph. Wiring and HVAC are not much of interesting photos. They have been busy but now were able to really see changes.
The small box on the wall is for the new flat screen tv!!! The tv will be much larger than the small box. That is just for the heavy arm so the tv can sit flat against the wall.
I think I am most excited about my new/improved/larger laundry room. The skylight will be the crowning touch to the room.
The small box on the wall is for the new flat screen tv!!! The tv will be much larger than the small box. That is just for the heavy arm so the tv can sit flat against the wall.
I think I am most excited about my new/improved/larger laundry room. The skylight will be the crowning touch to the room.