The sink arrived and it was the right one. It fit. It was not chipped or cracked. The counters are completely in and the backsplash can now go up. The backsplash is tumbled slate. I love it.

This first photos is of the tile above the stove top. Small framed area on point with 5 smaller tiles for the "blink" effect.



Here are the photos of the backsplash installed before grout.



Also the baseboard and coat hooks and lots of other important but small minor details have been completed.

I'll have to make another post about the tv, speakers and all that makes up the electronic system so great.

I think I see the end in sight.

Thursday, February 17, 2011

February 16, 2011

My new kitchen is a mess. The whole house is a mess. It looks like a hoarder's house. There are only pathways you can walk. Things are out of place big time! Dust is everywhere and it is a loosing battle to keep the house clean at this point. But the end is in sight. I will not have a refrigerator in my living room forever and dust is a protective layer, right?

Progress is being made . The laundry room has tile down. (grout will be next) The kitchen and living room have yards of trim stained and ready for final finish.

Oh I forgot, another problem with the countertops was the one over the washer and dryer. The bracket for the support would not work. Another delay. Chris got a steel support between the wall and the cabinets. Another crisis averted.




February 15, 2011

I realized that it looks like not much go done between cabinet installation and countertops arrival. Lots of lights and outlets were installed.

Take note of the undercabinet lights and know that the ceiling lights are on a dimmer to add to any mood. Crown molding and footboards were also added to the cabinets.

February 14, 2011

Happy Valentine's Day!!
The countertops arrive. What a great Valentine's Day present. All was going so well. The seam was matched and is invisible. Then the undercabinet sinks were go to in. Small prep sink looks great. They were about to adhere the large sink when he noticed that it was cracked and chipped. UGH!!! Quick call to Kathy, the designer who ordered the sink. She found one online and had it shipped ASAP. The countertop dudes would be back on Thursday. Crisis averted. This hiccup delayed the backsplash etc.

I think they look great.


Monday, February 7, 2011

February 3, 2011

The cabinets arrived just after the snow storm. Chris helped pull the big truck up the driveway. They finally made it. The unloading started. Kathy was here and helped tell which piece was which and where it should go. The laundry, dinning and kitchen were full of cabinets. Now it was time for the guys to play cabinet Tetris. I'm not sure how they did it but the cabinets seemed to go in very quickly.

Friday, February 4th the countertops were measured and will be here in 10 days.

Now for the photos.






Tuesday, February 1, 2011

February 1, 2011

I have the best crew doing this kitchen remodel. They showed up today to work even though they arrived by 9 am at the start of the 2011 Blizzard. It has continued to snow and blow all day. We have about 12 inches by the time they left at 3:30. But more progress and different smells in the house today. Fresh paint. I hope you like the color. I think once the cabinets are in the paint will be less "sunshine".

This is Chris painting the ceiling and walls.


Note the floors. They will be beautiful.
The wall area not painted will be where cabinets are planned.




January 31, 2011


This is Sean putting in the kitchen oak floor. He installed the other wood floors in the rest of the house. He will be back on Wednesday to finish the installation and then return later in the renov to finish the floor. I love progress